Skip to content
  • Home
  • News
  • Subcontractors
  • About Buch
    • History
    • Team
    • Culture
    • Safety
    • Financials
  • What We Do
    • Base Buildings
    • Interiors
    • Government
    • Life Sciences
    • Repositioning
    • Multifamily
    • Retail
    • Education
    • Service Work
    • Sustainability
  • Careers
  • Contact Us
  • News
  • Subcontractors
  • MaxCyte
    Rockville, MD
  • United Therapeutics Cleanroom Renovation and Filler Installation
    Silver Spring, MD
  • Capital Digestive Care
    Silver Spring, MD
  • Confidential Biopharmaceutical Client
    MD
  • AstraZeneca Cell Therapy Suite
    Gaithersburg, MD
  • Emergent BioSolutions Camden
    Baltimore, MD
  • National Institute of Science and Technology (NIST)
    Gaithersburg, MD
  • AstraZeneca Power Reliability Upgrades
    Gaithersburg, MD
  • AstraZeneca Laboratory
    Gaithersburg, MD
  • Applied Biomimetic
    Gaithersburg, MD
  • GlaxoSmithKline
    Rockville, MD
  • Novavax
    Gaithersburg, MD
  • Life Sciences
    AstraZeneca Laboratory
    Gaithersburg, MD

     

    AstraZeneca Laboratory
    Gaithersburg, MD

     

    Buch supports the Facilities Engineering department with a wide range of technical projects in AstraZeneca’s lab, pilot plant, vivarium, small scale manufacturing, and large scale manufacturing spaces. As science and space requirements evolve Buch supports the site in building out new laboratories and renovating existing laboratories, replacing AHUs and fume hoods, renovating labs during full or partial shutdown periods, replacing entire roofs, installing new WFI and RODI systems, and installing robots and other lab equipment, among other things.

    To support the expanding capabilities at the site the Buch team performed the ADC (antibody drug conjugates) Lab expansion project which more than doubled the size of AstraZeneca’s existing ADC space and reorganized the layout for maximized efficiency. The key requirement and challenge of the project was keeping the existing lab running uninterrupted for all but a single 2-week shut down when the new exhaust systems were tied into the existing exhaust systems and existing operations were relocated into the newly expanded space. We then renovated the old lab. The lab renovation/expansion included a fully welded stainless steel exhaust duct system, 12 flow hoods, a self-contained vacuum system, lab gases, casework, and airlocks.

    Architect
    WB Engineers + Consultants
    Architect
    WB Engineers + Consultants
     

 

 

RELATED PROJECTS

Washington, DC
Corporate Headquarters
11292 Buch Way
Laurel, MD, 20723

301.369.3500

Southeast Office
400 N. Tampa Street,
Suite 2830
Tampa, FL 33602

813.798.2008

New York, NY
New York Office
450 7th Avenue
Suite 802
New York, NY 10123

646.558.3560

© BUCH Construction