Leidos Generator at Fort Detrick

Fort Detrick, MD

Buch performed a major utility upgrade to Building 535 for Leidos’ research facility on the Fort Detrick Army Base in Frederick, MD. The project included installation of a new 1.25MW diesel generator with concrete foundation in the parking lot nearby. Approximately 175 LF of underground electrical duct bank was installed under the road and up to the utility tie-in. At the tie-in point, the old 5kV switchgear was demolished and redundant utility connections were removed to make way for new 5kV gear and emergency power transfer switches. In order to keep the building operational during the project, temporary generators were connected downstream from the switchgear to provide power 24/7 to the entire building for about a month between disconnecting and reinstalling the permanent utility connections.

Project Details

Architect
RMF Engineering, Inc

Location
Fort Detrick, MD


Related Work

AstraZeneca Area 6
Life Sciences
Arcellx
Life Sciences
Howard University – Numa Adams Laboratory
Life Sciences
Novavax Professional Drive
Life Sciences
Novavax Clinical Immunology
Life Sciences
Confidential Pharmaceutical Client
Life Sciences